AI & project data · 4 min read

Reviewing an AI proposal when a delivery date changes

Separate the supplier’s confirmed date, the possible schedule impact and the proposed response. Each needs a different kind of evidence.

STR-024 / Rev CDOCUMENT CONTROL
1234ABC18 0006 0006 0006 0005 0005 000S1 · h=150+16.500Ø10a200S4 · h=150+16.500Ø10a200S2 · h=150+16.500Ø10a200S5 · h=150+16.500Ø10a200S3 · h=150+16.500Ø10a200B1 (250×500)B4 (250×550)B2 (250×500)B5 (250×550)B3 (250×500)B6 (250×550)STAIR COREOPENING600×60011LEVEL 5 · SLAB & BEAM LAYOUTIllustrative scale 1:100 · dimensions in mmSECTION 1–1B4 · 250×5502Ø20 + 3Ø20Ø8a150GENERAL NOTES01 All dimensions in millimetres.02 Levels shown in metres.03 Coordinate openings with MEP.04 Refer to column schedules.05 Illustrative geometry only.BEAM DETAIL B42505502Ø20 / 3Ø20 · Ø8a150REVISION REGISTERC 05.11.26 CoordinationB 28.10.26 ReviewACMS / RIVERSIDELEVEL 5 STRUCTURAL PLANSTR-024Rev CILLUSTRATIVE · NOT FOR CONSTRUCTIONSheet 01 / 01 · 05 NOV 20261:100A1
  1. Rev BSuperseded
  2. Rev CIssued
  3. WO-018Linked drawing

Illustrative sheet · not for construction

Illustrative workflow records

1. Start with a confirmed change

“The steel is late” is not enough context. Identify the purchase order, affected line, previous date, new date and the supplier’s confirmation. The assistant should only use records available within the user’s project and document permissions.

2. Inspect the affected work

Follow the material demand to the work package and work order. Review the crew calendar and successor tasks. A possible impact is an inference until the relevant dates, dependencies and available stock have been checked.

3. Review assumptions in the proposal

A proposal to resequence work should state which dates change, which records support the change and what is still unknown. The project manager needs to see those assumptions, not just an answer saying the delay has been solved.

4. Keep approval with the responsible person

An AI-generated response is not a purchase approval, a new baseline or a payment authorization. The responsible person checks the source records and assumptions before approving and carrying out the proposed change.

Check with the team

  • The source and version can be opened.
  • Observed facts and inferred impacts are labelled separately.
  • Unknown dates or quantities are stated.
  • The proposed change has a decision owner.