Platform

One project record behind every module

Project and task codes link the schedule, work orders, documents and financial records. Maps shows locations and assignments, Digital Twin compares status over time, and the AI assistant finds and reviews related records.

Riverside / Shared project recordLINKED DATA
PROJECT / WBS 02.03Identity · permissions · change history
PLANBaseline / forecast
SITEWO-018 / QA-018
COMMERCIALPO-024 / IPC-006
  1. MapsLocation & assignments
  2. TwinStatus over time
  3. AIRecords in scope

Conceptual data relationships · illustrative project.

Maps

Sites and the records attached to them

Go from a project on the map to its schedule, purchase orders, people and documents. Each site shows how many staff and workers are assigned.

The map uses recorded project coordinates. The headcount shown here is illustrative and is not GPS or live attendance.

Maps · 3 sitesIllustrative

Digital Twin

Current status, history and a proposed scenario

Operational and financial views keep the date, the source record and the state of each value. Forecasts are labelled as forecasts.

01

Project progress

Compare planned dates, reported quantities and inspection milestones, and see which record changed the current status.

02

Commercial position

See budget, committed cost, certified work and cash separately, and trace each difference to a contract or evidence.

03

Scenario review

Test a delivery or productivity assumption. Record the basis and the owner before a plan change is considered.

Integrations

Agree integrations record by record

Accounting, legal signature and specialist design tools have their own responsibilities. A deployment agrees which system holds the original, how fields map, who has access, and how failed or mismatched transfers are reconciled.

  • AccountingPosting follows the agreed accounting boundary
  • Legal signatureSigned originals stay in the signing system
  • Design toolsACMS holds the issued revision and its status
  • SpreadsheetsMapped, test-loaded and reconciled before cut-over

Book a demo with your own project data

Send us a sample schedule, work order or payment file. The demo walks through that process in ACMS with your team.