Quality & safety

Inspections, acceptance, defects and site safety.

QA/QC engineers inspect work against the issued drawing and the inspection checklist. Accepted quantities move to QS; defects are raised with an owner and a due date and closed only after re-inspection. Safety permits, toolbox talks and incidents are recorded against the same project and location.

Riverside · Quality & safetyIllustrative
QA-018 / Level 5INSPECTION & NCR
REBAR SECTIONNCR-007 · Cover to verifyRE-INSPECT
RecordCheckStatus
QA-018Formwork L5Re-inspect
NCR-007Rebar coverOpen
PTW-112Pour permitApproved

An approved permit does not replace a completed inspection.

Used by
QA/QC engineer · HSE officer · Site supervisor · Consultant
Input records
Issued drawings, inspection checklists, completed work and site conditions
Results
Inspection records, accepted quantities, defect list and safety records

Process

How the work moves in ACMS

  1. 1

    Request an inspection

    The site team requests an inspection for a work order and location when the work is ready.

  2. 2

    Inspect against the checklist

    The inspector records results, photos and measurements against the issued revision.

  3. 3

    Raise and close defects

    Each defect has an owner, a due date and evidence of the fix. It closes only after re-inspection.

  4. 4

    Record safety

    Permits, daily talks and incidents are kept with the project, location and the people involved.

On site

When something goes wrong

What happens

The Level 5 formwork fails inspection on cover to reinforcement.

How it is handled in ACMS

The inspector raises NCR-007 with photos. The work order stays on hold, the crew fixes the spacers and the inspection is repeated before the pour is released.

Linked records

  1. WO-018
  2. inspection QA-018
  3. defect NCR-007
  4. re-inspection
  5. accepted quantity

Preparing a demo

What to bring

One inspection checklist you use today, a completed inspection record and an open defect with its photos.

Book a demo
Can consultants sign off inspections?

Yes, within the inspections assigned to them. Their access is limited to that scope.

Does a failed inspection block the next step?

It keeps the related work order on hold and the quantity out of the claim until the re-inspection passes.